Login to Terminal
4.8/5 from 1,000+ client reviews

Hotel and resort FF&E, received, warehoused and installed room by room.

We receive every vendor’s shipment for your hotel or resort, hold it in our own warehouse by floor and room type, and send uniformed handlers to install it on the schedule your property and contractor set, for new openings, renovations and brand-standard refreshes.

Include specific details such as collection from and delivering to complete address, type of items, number of items, weight of each item, dimensions (L x W x H), current packaging type, and estimated value of the order.

Between the vendors and the property

One accountable team from the first vendor delivery to the last guestroom.

A hotel FF&E package arrives in pieces: case goods from one factory, seating from another, and lighting, mirrors, artwork and drapery from a dozen more, on lead times that rarely line up with the construction schedule. When every vendor ships straight to the site, the loading dock and the corridors become the warehouse, and damage is often found weeks after anyone could still claim it.

We put a receiving warehouse between the vendors and the property. Every shipment is checked in against your purchase orders, photographed and stored by floor and room type until the rooms are ready. Then we deliver in install order, and our handlers place, assemble and level each piece, so the property team signs off on finished rooms rather than stacks of cartons.

What hotel FF&E logistics includes

Every phase of the FF&E package, under one account.

01

Vendor coordination

We book inbound deliveries by appointment, track what is due against your FF&E schedule, and flag anything late or short before it holds up a floor.

02

Receiving and inspection

Each shipment is counted, photographed and logged against the purchase order. Damage and shortages are recorded on arrival, while the vendor can still replace them.

03

Project warehousing

Climate-controlled storage held by property, floor and room type, so a guestroom package can be pulled complete rather than pieced together on site.

04

Sequenced delivery

Deliveries are timed to the install schedule, staged by floor, and coordinated with the general contractor and the property’s dock and elevator times.

05

Installation

Handlers unpack, assemble, place and level case goods, seating, tables, lighting, mirrors and artwork to the layout drawings and brand standards.

06

Punch, attic stock and closeout

We work the punch list, remove all packaging, store attic stock for the property, and hand over with photos and a documented item count.

How a hotel FF&E install runs

From purchase order to handover.

01

Review

We go through the FF&E schedule, room-type matrix, site access and phasing with your designer, purchasing agent or owner’s team.

02

Receive & stage

Vendors ship to our warehouse. Every item is checked in, photographed, logged in Terminal and held by floor and room type, and damage is reported while replacements still fit the schedule.

03

Install

We deliver in the agreed order and install floor by floor, room by room.

04

Close out

Punch list, packaging and debris removal, attic stock stored, and a final walk with your team.

Renovations and refreshes

Renovations while the hotel stays open.

Many hotel projects happen with guests in the building. A property improvement plan or brand refresh is usually completed in blocks of floors or rooms taken out of inventory for a set window. We plan around that window: the outgoing furniture is de-installed and removed, the new pieces arrive on the day the block is released, and our handlers use back-of-house routes and service elevators so guests on other floors are not disturbed. De-installation runs through our reverse logistics team.

  • De-installation and removal of outgoing FF&E
  • Deliveries timed to rooms released from inventory
  • Back-of-house and service-elevator routing
  • Corridor, floor and elevator protection
  • Certificates of insurance for the property and building management
  • Packaging and debris removed the same day
Who we work with

Built for the teams that deliver a hotel opening.

We work for the people who carry the FF&E package: hospitality interior designers, purchasing agents, owners and asset managers, management companies, general contractors and the property’s own project team. Each sees the same item records and photos, so a question about a missing nightstand or a damaged headboard is answered from the record, not from memory.

Full-service hotelsBoutique hotelsResorts and spasExtended-stay and select-serviceBranded residencesHotel restaurants and barsClubhouses and amenity spaces

For the wider hospitality picture, see hospitality and FF&E. For FF&E programs beyond hotels, see FF&E logistics. If you only need a receiving address for a hotel project, see our receiving warehouse for hotels. Regional detail is on FF&E Denver and FF&E Los Angeles, and every warehouse is listed on our locations page.

Elite Terminal client portal dashboard
POWERED BY TERMINAL

See every room’s FF&E before it reaches the property.

Our proprietary platform, Terminal, holds the receiving record for every item: photos, condition notes, purchase order, warehouse location and delivery status. Your designer, purchasing agent and property team review the same record at any time.

  • Item photos and condition notes on arrival
  • Counts by floor, room type and vendor
  • Delivery and installation status

Across 50,000+ deliveries, 99% arrive on time and our damage rate is under 1%.

Frequently asked questions

Hotel & Resort FF&E Logistics

What does a hotel FF&E logistics company do?
It takes responsibility for the FF&E package between the vendors and the finished room: receiving every vendor’s shipment, inspecting and storing it, delivering it in install order, installing it and closing out the punch list. We do all of it under one account, so there is one record and one team accountable for each item.
Do you install hotel FF&E or only deliver it?
Both. Our handlers unpack, assemble, place and level case goods, seating, tables, lighting, mirrors and wall-hung artwork to the layout drawings, then remove all packaging.
Can you work in a hotel that stays open during a renovation?
Yes. We schedule deliveries for the floors or room blocks released from inventory, use back-of-house routes and service elevators, protect corridors and finishes, and keep noise and debris within the work area.
How do you handle damaged or short-shipped items?
Every item is inspected and photographed when it reaches our warehouse, and damage or shortages are reported to your team on arrival. That gives the vendor time to replace pieces before the floor is scheduled for installation.
Can you store hotel FF&E until the property is ready?
Yes. We hold the package in climate-controlled storage by property, floor and room type for as long as the construction schedule needs, and we can store attic stock after opening.
Do you handle multi-property rollouts?
Yes. A brand refresh across several properties can be received and staged at the warehouse closest to each property, with one set of records across the whole program. Our warehouses are listed on our locations page.
Do you provide certificates of insurance for the property?
Yes. We provide certificates of insurance for the property, the building and the management company before we arrive.
What do you need to quote a hotel FF&E project?
The FF&E schedule or vendor list, the property address, the room count and room-type mix, the install window and phasing, and access details such as dock hours and service elevators. We respond within 24 hours.

Plan the hotel’s FF&E as one program.

Send us the FF&E schedule, the property and the install window, and we’ll respond within 24 hours.